Ice Scoop, Heavy Duty Cast Aluminum, Ergonomic S-Curve Handle, Commercial Grade for Ice, Coffee, Popcorn, Flour, Sugar, Food-Grade & Rust-Proof Kitchen Tool (XL (38oz)) - size: XL (38oz)
Ice Scoop, Heavy Duty Cast Aluminum, Ergonomic S-Curve Handle, Commercial Grade for Ice, Coffee, Popcorn, Flour, Sugar, Food-Grade & Rust-Proof Kitchen Tool (XL (38oz)) - size: XL (38oz)
About this item
- Commercial-Grade & Unbreakable Say goodbye to flimsy, rusting scoops! Crafted from heavy-duty cast aluminum, this ice scoop offers superior strength and is naturally rust-proof. It won't crack, chip, or corrode, ensuring a lifetime of reliable use in your kitchen or business.
- Ergonomic S-Shape Handle for Comfort Our innovative curved handleis designed for all-day comfort. The sleek S-curve fits perfectly in your palm, reducing wrist strain. Whether you're a barista in a rush or portioning pet food, experience effortless scooping with no hand fatigue.
- No-Spill Design & Sharp, Thin Edge Master the pour! This scoop features a no-spill design for clean, controlled dispensing from ice machines or bulk bins. The precision-thinned edge easily slips into tight corners of bags and containers, grabbing every last coffee bean or grain.
- Seamless & Easy-Clean Construction Enjoy hassle-free cleanup! The one-piece, seamless design has no cracks or crevices for food to get stuck. Its smooth, polished surface resists residue. A quick rinse is all it needs – simply hand wash and dry for spotless, sanitary storage.
- Ultimate Multi-Purpose Kitchen Tool Your go-to scoop for everything! From ice cubes, coffee beans, and popcorn to flour, candy, and pet food. With a thickened, sturdy build, it effortlessly handles heavy items like large ice blocks and bulk grains. A true all-in-one workhorse.
Overview
- Color: stainless steel color
- Material: Aluminum
- Brand: BUBBLE-FLY
- Item Weight: 9.07 g
- Is Dishwasher Safe: Yes
Couldn't load pickup availability
Low stock: 10 left
View full details

Reviews
-
⭐⭐⭐⭐⭐
Daniel Brooks — Fort Worth, Texas
I ordered a few feeding and watering supplies from Farmora, and everything was straightforward to set up. The products felt practical, sturdy, and well suited for everyday livestock care. Ordering was simple, and I would shop here again when we need more farm equipment.
-
⭐⭐⭐⭐⭐
Rachel Turner — Des Moines, Iowa
Farmora made it easy to find supplies for our chickens and pigs in one place. The product details were clear, and the items arrived in good condition. I especially liked that the store focuses on useful farm equipment without making the shopping process feel complicated.
-
⭐⭐⭐⭐⭐
Michael Carter — Lexington, Kentucky
I purchased several cattle care accessories, and they worked well for our daily routine. The products were easy to understand and matched the descriptions. Farmora feels like a convenient store for practical livestock supplies, and the overall buying experience was smooth.
-
⭐⭐⭐⭐⭐
Emily Harris — Springfield, Missouri
We ordered a few chicken coop and feeding accessories for our small farm. Everything was easy to organize and use, and the quality felt suitable for regular farm work. The selection was helpful, and I am happy with the purchase overall.
New Arrivals
-
Example product title
Regular price $19.99 USDRegular priceSale price $19.99 USD -
Example product title
Regular price $19.99 USDRegular priceSale price $19.99 USD -
Example product title
Regular price $19.99 USDRegular priceSale price $19.99 USD -
Example product title
Regular price $19.99 USDRegular priceSale price $19.99 USD
FAQ
Where do Farmora products ship from?
Farmora works with multiple fulfillment locations and suppliers. Products in the same order may ship from different locations depending on availability, package size, and delivery destination.
How long does shipping take?
Orders are generally processed within 1–3 business days. Delivery within the United States typically takes an additional 5–10 business days after shipment. Carrier delays, weather, holidays, and remote locations may affect delivery times.
How much is shipping?
Farmora charges a flat shipping fee of $6.90 per order. The shipping charge will be displayed during checkout before payment is completed.
Can I track my order?
Yes. Once tracking information becomes available, it will be sent to the email address used at checkout. Tracking may take several business days to show movement after a shipping label is created.
Can I change or cancel my order after placing it?
Contact us as soon as possible at eawlopasabeul@gmail.com. We may be able to update or cancel an order before processing or shipment begins, but changes and cancellations are not guaranteed.
What is Farmora’s return policy?
Eligible unused products may generally be returned within 30 days after delivery. Products must be clean, complete, and in their original condition and packaging. Items exposed to animals, barns, manure, feed, chemicals, or other contamination may not qualify for return.
What should I do if my order arrives damaged, defective, or incorrect?
Contact us promptly at eawlopasabeul@gmail.com with your order number and clear photographs of the product, packaging, shipping label, and issue. Please keep all packaging and do not use or discard the product until we provide instructions.
Why did I receive only part of my order?
Orders containing multiple products may be shipped separately from different fulfillment locations. Each package may have its own tracking number and delivery date. There is normally no additional standard shipping fee for split shipments.
How do I know whether a product is suitable for my animals?
Review the product description, dimensions, materials, animal size recommendations, installation requirements, warnings, and manufacturer instructions before ordering. Farmora focuses on cattle, pig, and chicken supplies, but not every product is suitable for every animal or farm setup.
How can I contact Farmora?
For product, order, shipping, return, or policy questions, email us at eawlopasabeul@gmail.com. We aim to respond to most inquiries within 1–2 business days, Monday through Friday.
Blog posts
View all-
Top 5 Ways to Keep Pig Waterers Working Through...
Frozen pig waterers steal a morning fast. These five practical approaches keep cattle-safe habits out of the pig pen and focus on trough design, heat, and refill timing that actually...
Top 5 Ways to Keep Pig Waterers Working Through...
Frozen pig waterers steal a morning fast. These five practical approaches keep cattle-safe habits out of the pig pen and focus on trough design, heat, and refill timing that actually...
-
Five Calcium Rules That Keep Laying Hens From S...
Layer feed is not the whole calcium story. These five rules cover oyster shell, hopper placement, particle size, and the lay cycle so hens can build strong shells without turning...
Five Calcium Rules That Keep Laying Hens From S...
Layer feed is not the whole calcium story. These five rules cover oyster shell, hopper placement, particle size, and the lay cycle so hens can build strong shells without turning...
-
The Fly Barrier: A Deep-Dive Analysis of Integr...
Don't let biting fly infestations drain your dairy herd's milk production and profit margins. This technical deep-dive analysis reveals how to implement an integrated pest management strategy using insect growth...
The Fly Barrier: A Deep-Dive Analysis of Integr...
Don't let biting fly infestations drain your dairy herd's milk production and profit margins. This technical deep-dive analysis reveals how to implement an integrated pest management strategy using insect growth...